Brantford : Règlement no 465, art. 465.27.3 — Site - cleaned - cleared - upon completion Upon completion of demolition, the entire site shall be cleared and cleaned of all debris, left free from holes or excavations and provided and maintained with a suitable ground cover
Property Standards, Maintenance and Occupancy
Vérifié le
Texte indexé
Site - cleaned - cleared - upon completion Upon completion of demolition, the entire site shall be cleared and cleaned of all debris, left free from holes or excavations and provided and maintained with a suitable ground cover
Extrait court. Le reste du texte est sur la source officielle.
Source officielle · Table des matières
Sujets
Articles voisins
- 465.27.1 Permit - required
- 465.27.2 Walls - remaining - safe - sound The owner of any building or part thereof being demolished shall leave any remaining wall or walls (including any former party wall or walls, whether separately or jointly owned) structurally sound, weathertight, in a safe condition and in conformity with the standards in the Building Code
- 28
- 465.28.1 Water - vessel - pool - other container - drainage In each calendar year between the dates of May 1 to September 30th, all vessels, pools, tires, eaves- troughs, containers, structures, or other goods and materials in which water may accumulate, and which are located on the external areas of any property within the City of Brantford, shall be kept drained of water at all times
Autres villes
Pour signaler une correction : info@bylawinsider.com. Ce lien ouvre votre programme de courriel.
Copie non officielle, pour faciliter la lecture. La version officielle prévaut. Source officielle
Short excerpts of a public bylaw PDF. The official PDF governs.