Newmarket : Règlement no 2017-62, art. 8.5 — The storm water run-off from all downspouts or impervious surfaces shall be contained within the limits of the premises from which it originated until absorbed by the soil or drained to a storm sewer or to a natural or artificially created swale or watercourse
Property Standards By-law
Vérifié le
Texte indexé
The storm water run-off from all downspouts or impervious surfaces shall be contained within the limits of the premises from which it originated until absorbed by the soil or drained to a storm sewer or to a natural or artificially created swale or watercourse.
Extrait court. Le reste du texte est sur la source officielle.
Source officielle · Table des matières
Sujets
Articles voisins
- 8.3 Roof drainage, storm water, swimming pool or sump pump water discharge shall
- 8.4 Subsurface drainage shall be installed where there is recurring excessive ponding caused by surface water
- 9.0 EXTERIOR LIGHTING AND SUPPORTS
- 9.1 In all Yard s, standards supporting artificial lights and all exterior lighting and the connections thereto shall be kept in a safe condition, in good repair and in good working order
Autres villes
Pour signaler une correction : info@bylawinsider.com. Ce lien ouvre votre programme de courriel.
Copie non officielle, pour faciliter la lecture. La version officielle prévaut. Source officielle
Short excerpts of a public bylaw PDF. The official PDF governs.