Waterloo By-law 2025-028, s. 9.2(3) — Noise By-law
Last checked
Indexed text
The Noise study report mentioned in subsection 2(a) shall include the following information:
- (a) the description of the equipment/facility/operation and the operating hours;
- (b) the land use zoning designation of the surrounding area;
- (c) the location and distance to Points of Reception;
- (d) the relevant architectural and mechanical drawings;
- (e) the details of proposed Noise control measures; and,
- (f) other details which may be required and outlined in NPC 300 or similar codes, as amended from time to time, or any successor thereof.
Short excerpt. The rest of the text is on the official source.
Official source · Table of contents
Topics
Related sections
Other cities
To report a correction: info@bylawinsider.com. This link opens your mail program.
Unofficial copy for convenience; the official version governs. Official source
Short excerpts of the public bylaw page. The city's page governs.