Brantford : Règlement no 465, art. 465.10.3 — Structural integrity Where, in the opinion of the Property Standards Officer, there is doubt as to the structural integrity or condition of a building or structure or part thereof, the officer may order that a building or structure or part thereof be examined by a professional engineer who is qualified to perform such inspections and licenced to practice as an engineer in Ontario, at the owner’s sole expense, and that a written report, which may include drawings detailing recommended remedial work, be provided to the officer
Property Standards, Maintenance and Occupancy
Vérifié le
Texte indexé
Structural integrity Where, in the opinion of the Property Standards Officer, there is doubt as to the structural integrity or condition of a building or structure or part thereof, the officer may order that a building or structure or part thereof be examined by a professional engineer who is qualified to perform such inspections and licenced to practice as an engineer in Ontario, at the owner’s sole expense, and that a written report, which may include drawings detailing recommended remedial work, be provided to the officer.
Extrait court. Le reste du texte est sur la source officielle.
Source officielle · Table des matières
Sujets
Articles voisins
- 465.10.1 Building - structurally sound A building, or any part thereof, shall be capable of sustaining its own weight together with the loads that may be applied thereto by reason of its use and occupancy, natural causes such as snow, and wind and all other causes set out in the Building Code Act, 1992
- 465.10.2 Standards - safety - soil capacity - maximum The factor of safety specified in the Building Code Act, 1992 is the minimum standard which is to be met without exceeding soil capacity and the maximum differential or other settlement specified in the Building Code Act, 1992; By-law 102-2003, 26 May, 2003
- 465.10.4 Remedial work - professional engineer - requirement Where remedial work is recommended by the professional engineer, all such remedial work will be undertaken by the owner, at the owner’s sole expense, in consultation with the professional engineer
- 465.10.5 Report - professional engineer - requirement Upon completion of the required work outlined in the report of the professional engineer, a further report be prepared certifying that all required work has been completed and is in accordance with all applicable legislation. By-law 3-2012, 23 January, 2012
Autres villes
Pour signaler une correction : info@bylawinsider.com. Ce lien ouvre votre programme de courriel.
Copie non officielle, pour faciliter la lecture. La version officielle prévaut. Source officielle
Short excerpts of a public bylaw PDF. The official PDF governs.