Newmarket : Règlement no 2017-62, art. 31.5 — All work specified by the certified heating contractor shall be completed in the manner and within the time which shall be specified by the contractor
Property Standards By-law
Vérifié le
Texte indexé
All work specified by the certified heating contractor shall be completed in the manner and within the time which shall be specified by the contractor.
The time specified shall be acceptable to the Officer.
Extrait court. Le reste du texte est sur la source officielle.
Source officielle · Table des matières
Sujets
Articles voisins
- 31.3 Fireplaces and other solid-fuel burning appliances shall be connected to a smoke pipe, chimney flue or gas vent and shall be installed in accordance with the current standards of the Underwriters Laboratory of Canada and the manufacturer’s instructions
- 31.4 If, in the opinion of the Officer there is a reason to believe that the heating system of a building has been constructed, installed or maintained not in compliance with the requirements of all applicable governmental regulations, the Officer may order that such heating system be examined and a written report be prepared by a certified heating contractor and employed by the Owner of the building or his or her authorised agent. The written report sign ed by the certified heating contractor and giving details of the findings and proposed repair s shall be submitted to the Property Standards Officer
- 31.6
- 31.6 On completion of all work to the heating system, the Officer shall be provided with a signed certificate from the certified heating contractor
Autres villes
Pour signaler une correction : info@bylawinsider.com. Ce lien ouvre votre programme de courriel.
Copie non officielle, pour faciliter la lecture. La version officielle prévaut. Source officielle
Short excerpts of a public bylaw PDF. The official PDF governs.