Richmond : Règlement no 8856, art. 4.2.3 — If an exemption or relaxation is granted by the General Manager the applicant must, at least forty-eight (48) hours before the start of the exemption period, distribute a notice, in a form and with content satisfactory to the General Manager, to all residences within a one hundred (100) metre radius. Such a notice is to include, but will not be limited to, all times and dates, the specific location and general description of the activity. The notice requirement in this section is in addition to the signage requirement in section 4.1.2
Vérifié le
Texte indexé
If an exemption or relaxation is granted by the General Manager the applicant must, at least forty-eight (48) hours before the start of the exemption period, distribute a notice, in a form and with content satisfactory to the General Manager, to all residences within a one hundred (100) metre radius. Such a notice is to include, but will not be limited to, all times and dates, the specific location and general description of the activity. The notice requirement in this section is in addition to the signage requirement in section 4.1.2.
6648716 Bylaw 8856 Page 12
Extrait court. Le reste du texte est sur la source officielle.
Source officielle · Table des matières
Sujets
Articles voisins
- 4.2.2 With respect to exemptions or relaxations from the limitations imposed by section 4.1.1(m) of this Bylaw for construction projects, the General Manager may grant the exemption if satisfied that
- 4.2.2(a)
- 4.2.4 An applicant who has been refused an exemption or relaxation by a decision of the General Manager may apply to have Council reconsider that decision in accordance with the following procedures
- 4.2.4(a)
Autres villes
Pour signaler une correction : info@bylawinsider.com. Ce lien ouvre votre programme de courriel.
Copie non officielle, pour faciliter la lecture. La version officielle prévaut. Source officielle
Short excerpts of a public bylaw PDF. The official PDF governs.