Brampton : Règlement no 93-93, art. 39(1) — Traffic and Parking By-law
Vérifié le
Texte indexé
When construction has been completed and the City has not incurred and will not be incurring any costs, the City shall, upon application by the person paying the deposit, refund the deposit to that person.
Extrait court. Le reste du texte est sur la source officielle.
Source officielle · Table des matières
Sujets
Articles voisins
- 0.914 and 2.4 metres above the finished grade of the abutting highways, and is within the triangular area indicated on Schedule XLI - Intersection Sightline Triangle, attached to this by-law. This triangular area shall be created by joining the following three points; the roadway point of intersection, the position of the stopped vehicle, and the sight distance clearance point, all as per Schedule XLI
- 39
- 39(2)
- 39(3)
Autres villes
Pour signaler une correction : info@bylawinsider.com. Ce lien ouvre votre programme de courriel.
Copie non officielle, pour faciliter la lecture. La version officielle prévaut. Source officielle
Short excerpts of a public bylaw PDF. The official PDF governs.