Burlington By-law 019-2003, s. 8 — The operation of any construction equipment in connection with 9:00 pm – 7:00 am* construction. * (12:00 noon Sundays)
Last checked
Indexed text
The operation of any construction equipment in connection with 9:00 pm – 7:00 am* construction. * (12:00 noon Sundays)
Short excerpt. The rest of the text is on the official source.
Official source · Table of contents
Topics
Related sections
- 6 The operation of any motorized conveyance other than on a At any time highway or other place intended for its operation
- 7 The operation of commercial car wash with air drying equipment. 11:00 pm – 7:00 am
- 9 Loading, unloading, delivering, packing, unpacking, or otherwise 11:00 pm – 7:00 am handling any containers, produce, materials, or refuse whatsoever, unless necessary for the maintenance of essential services
- 10 The operation of solid waste, refuse, or recyclable bulk lift or 9:00 pm – 7:00 am refuse compacting equipment
Other cities
To report a correction: info@bylawinsider.com. This link opens your mail program.
Unofficial copy for convenience; the official version governs. Official source
Short excerpts of a public bylaw PDF. The official PDF governs.