Burlington : Règlement no 019-2003, art. 8 — The operation of any construction equipment in connection with 9:00 pm – 7:00 am* construction. * (12:00 noon Sundays)
Vérifié le
Texte indexé
The operation of any construction equipment in connection with 9:00 pm – 7:00 am* construction. * (12:00 noon Sundays)
Extrait court. Le reste du texte est sur la source officielle.
Source officielle · Table des matières
Sujets
Articles voisins
- 6 The operation of any motorized conveyance other than on a At any time highway or other place intended for its operation
- 7 The operation of commercial car wash with air drying equipment. 11:00 pm – 7:00 am
- 9 Loading, unloading, delivering, packing, unpacking, or otherwise 11:00 pm – 7:00 am handling any containers, produce, materials, or refuse whatsoever, unless necessary for the maintenance of essential services
- 10 The operation of solid waste, refuse, or recyclable bulk lift or 9:00 pm – 7:00 am refuse compacting equipment
Autres villes
Pour signaler une correction : info@bylawinsider.com. Ce lien ouvre votre programme de courriel.
Copie non officielle, pour faciliter la lecture. La version officielle prévaut. Source officielle
Short excerpts of a public bylaw PDF. The official PDF governs.