Ajax : Règlement no 46-2017, art. 5.55 — Repairs made to walls, ceilings and other interior surfaces shall be completed in a workmanlike manner and each repair shall be finished to match the existing surfaces
Vérifié le
Texte indexé
Repairs made to walls, ceilings and other interior surfaces shall be completed in a workmanlike manner and each repair shall be finished to match the existing surfaces.
Extrait court. Le reste du texte est sur la source officielle.
Source officielle · Table des matières
Sujets
Articles voisins
- 5.53 Interior Finishes Every wall, ceiling, or other interior surface shall be maintained in a good state of repair, so as to be free from holes, cracks, damaged and deteriorating plaster or other material
- 5.54 Finishes, materials and separations shall be in accordance with the Ontario Building Code and shall be properly maintained
- 5.56 Unsightly chalk marks, stains, painted slogans, graffiti, and similar markings or defacements on walls, ceilings and other interior surfaces shall be removed and the surface refinished when necessary
- 5.57 In the public part of a building, door and door frames including automatic door closures and all necessary hardware shall be maintained in a good state of repair to ensure the proper operation and integrity of the door and the door shall be a good fit in its frame
Autres villes
Pour signaler une correction : info@bylawinsider.com. Ce lien ouvre votre programme de courriel.
Copie non officielle, pour faciliter la lecture. La version officielle prévaut. Source officielle
Short excerpts of a public bylaw PDF. The official PDF governs.