Ajax : Règlement no 46-2017, art. 5.6 — Property Standards By-law
Vérifié le
Texte indexé
Despite Section 5.4, the owner of any property, which is designated residential in a Zoning By-law, on which is situated a building or part thereof that is boarded up for a period exceeding 24 months, shall ready the building for occupancy in accordance with the standards of this by-law or shall clear the property of all buildings, structures, debris or refuse and leave it in a graded and levelled condition.
Extrait court. Le reste du texte est sur la source officielle.
Source officielle · Table des matières
Sujets
Articles voisins
- 5.4 (a) with brick, concrete, concrete blocking, or any other masonry units and mortar, except where required by a Property Standards Officer under section 5.4 (c)
- 5.5 Where a building remains vacant for a period of more than ninety days, the owner shall ensure that all utilities servicing the building are properly disconnected or otherwise secured to prevent accidental or malicious damage to the building or adjacent property
- 5.7 Section 5.5 does not apply where such utilities are necessary for the safety or security of the building
- 5.8 Fire or Other Disaster In the event of fire or other disaster, measures shall be taken as soon as possible to restore the damaged building or structure so it complies with the standards of this By-law
Autres villes
Pour signaler une correction : info@bylawinsider.com. Ce lien ouvre votre programme de courriel.
Copie non officielle, pour faciliter la lecture. La version officielle prévaut. Source officielle
Short excerpts of a public bylaw PDF. The official PDF governs.