Cambridge : Règlement no 26-021, art. 6.6 — Where a building or structure is being demolished, every reasonable precaution shall be taken to protect adjoining Property and members of the public
Vérifié le
Texte indexé
Where a building or structure is being demolished, every reasonable precaution shall be taken to protect adjoining Property and members of the public.
Extrait court. Le reste du texte est sur la source officielle.
Source officielle · Table des matières
Sujets
Articles voisins
- 6.4 If an Owner uses plywood sheathing to secure an opening on a building, such plywood sheathing shall be at least 12.7 mm (0.5 in.) thick, firmly fastened to the building, and painted a colour that blends with the surrounding walls
- 6.5
- 6.7 The Corporation of the City of Cambridge By-law Number 26-021
- 6.8 Where a building or structure on a Property is demolished, the site shall be left in a graded and levelled condition
Autres villes
Pour signaler une correction : info@bylawinsider.com. Ce lien ouvre votre programme de courriel.
Copie non officielle, pour faciliter la lecture. La version officielle prévaut. Source officielle
Short excerpts of a public bylaw PDF. The official PDF governs.