Newmarket : Règlement no 2017-62, art. 14.5 — All work specified by the professional engineer shall be completed in the manner and within the time which shall be specified by the engineer. The time specified shall be acceptable to the Officer
Property Standards By-law
Vérifié le
Texte indexé
All work specified by the professional engineer shall be completed in the manner and within the time which shall be specified by the engineer. The time specified shall be acceptable to the Officer.
Extrait court. Le reste du texte est sur la source officielle.
Source officielle · Table des matières
Sujets
Articles voisins
- 14.3 Examination and testing of any building or structure or parts thereof required by Section 14.2 shall be conducted in a manner acceptable to the Officer and at the Owner 's expense
- 14.4 Details, drawings and specifications pertaining to all temporary shoring and other work deemed necessary by the professional engineer shall be included with the report required by Section 14.2
- 14.6
- 14.7 Upon completion of all of the work, a report, signed and stamped by the professional engineer that all of the work has been completed to his satisfaction and specifications shall be submitted to the Property Standards Officer
Autres villes
Pour signaler une correction : info@bylawinsider.com. Ce lien ouvre votre programme de courriel.
Copie non officielle, pour faciliter la lecture. La version officielle prévaut. Source officielle
Short excerpts of a public bylaw PDF. The official PDF governs.