Newmarket By-law 2017-62, s. 14.5 — All work specified by the professional engineer shall be completed in the manner and within the time which shall be specified by the engineer. The time specified shall be acceptable to the Officer
Property Standards By-law
Last checked
Indexed text
All work specified by the professional engineer shall be completed in the manner and within the time which shall be specified by the engineer. The time specified shall be acceptable to the Officer.
Short excerpt. The rest of the text is on the official source.
Official source · Table of contents
Topics
Related sections
- 14.3 Examination and testing of any building or structure or parts thereof required by Section 14.2 shall be conducted in a manner acceptable to the Officer and at the Owner 's expense
- 14.4 Details, drawings and specifications pertaining to all temporary shoring and other work deemed necessary by the professional engineer shall be included with the report required by Section 14.2
- 14.6
- 14.7 Upon completion of all of the work, a report, signed and stamped by the professional engineer that all of the work has been completed to his satisfaction and specifications shall be submitted to the Property Standards Officer
Other cities
To report a correction: info@bylawinsider.com. This link opens your mail program.
Unofficial copy for convenience; the official version governs. Official source
Short excerpts of a public bylaw PDF. The official PDF governs.