Toronto : Règlement no 629, art. 629-19 — Stairs, guards, handrails and other structures
Vérifié le
Texte indexé
Stairs, guards, handrails and other structures.
Extrait court. Le reste du texte est sur la source officielle.
Source officielle · Table des matières
Sujets
Articles voisins
- C Markings, stains, graffiti, painted slogans, smoke damage or other markings or defacement appearing on any exterior surface shall be removed, and, if necessary to maintain the exterior surface, the surface of these areas shall be restored, resurfaced and co-ordinated to the exterior finish of the building or structure
- D All canopies, marquees, signs, awnings, screens, grilles, stairways, pipes, ducts, standpipes, air conditioners and all similar equipment, attachments and their supporting members shall be maintained in good repair, properly anchored and protected from the elements, so as to prevent decay and rust, by paint or other protective coating
- A All stairs, verandas, porches, decks, loading docks, ramps, balconies, fire escapes and other similar structures and all treads, risers, guards, handrails, supporting structural members or other appurtenances attached to them shall be maintained free from defects and hazards, capable of supporting all loads to which they may be subjected, and in a safe, clean, sanitary condition and in good repair
- B Retaining walls. [Amended 2008-04-29 by By-law No. 349-2008]
Autres villes
Pour signaler une correction : info@bylawinsider.com. Ce lien ouvre votre programme de courriel.
Copie non officielle, pour faciliter la lecture. La version officielle prévaut. Source officielle
Short excerpts only. The official PDF on toronto.ca governs.