Toronto : Règlement no 719, art. A — Chapter 719 Snow and Ice Removal
Vérifié le
Texte indexé
Every owner or occupant of any building must, within 12 hours after any fall of snow, rain or hail has ceased, clear away and completely remove snow and ice from any sidewalk on any highway in front of, alongside or at the rear of the building.
Extrait court. Le reste du texte est sur la source officielle.
Source officielle · Table des matières
Sujets
Articles voisins
- 719-1 Definitions
- 719-2 Time limit for removal of snow and ice from sidewalks
- B After the removal of snow and ice, if any portion of the sidewalk becomes slippery from any cause, the owner or occupant must immediately and as often as necessary apply to 719-1 June 16, 2022 the sidewalk ashes, sand, salt or some other suitable material so as to completely cover the slippery surface
- C Subsection A does not apply to an owner or an occupant of a building where, pursuant to City of Toronto policy, the City of Toronto has undertaken the responsibility to clear away and completely remove snow and ice from the sidewalk on the highway in front of, alongside or at the rear of the building at that location. [Added 1999-11-25 by By-law No. 776-1999]
Autres villes
Pour signaler une correction : info@bylawinsider.com. Ce lien ouvre votre programme de courriel.
Copie non officielle, pour faciliter la lecture. La version officielle prévaut. Source officielle
Short excerpts only. The official PDF on toronto.ca governs.