Windsor : Règlement no 148-2025, art. 5.2.29 — Demolition of a Building
Vérifié le
Texte indexé
Demolition of a Building
Where a building or structure is demolished:
Extrait court. Le reste du texte est sur la source officielle.
Source officielle · Table des matières
Sujets
Articles voisins
- 5.2.27(a) Damaged Building Every building damaged by fire, storm, or other unintended causes until repairs have been completed shall effectively
- 5.2.28 Materials Used to Board Buildings All materials used to board vacant buildings damaged by fire, storm, or other unintended causes, shall be tight fitted plywood, composite panels or wood boards painted with an exterior grade paint so that the colour compliments the building’s exterior elements and is acceptable to the Officer
- 5.2.29(a)
- 5.2.30 Demolition of Part of a Building Where part of a building or structure has been demolished, the exterior walls of the remaining part of the building or structure shall comply with the requirements of this by-law and the walls shall be finished with a parge coat of cementitious mortar or otherwise treated with a protective coating to prevent the entry of water into the building and to present a neat and uniform appearance, in the opinion of the Officer, free from the outlines of partitions, stairs, doors, floors, signs and from areas of multi-coloured paint or wallpaper
Autres villes
Pour signaler une correction : info@bylawinsider.com. Ce lien ouvre votre programme de courriel.
Copie non officielle, pour faciliter la lecture. La version officielle prévaut. Source officielle
Short excerpts of a public bylaw PDF. The official PDF governs.