Barrie By-law 2024-094, s. 5.1.2.3 — existing and finished ground levels or grades, and
Pool Enclosure By-law
Last checked
Indexed text
existing and finished ground levels or grades, and
Short excerpt. The rest of the text is on the official source.
Official source · Table of contents
Related sections
- 5.1.2.1 lot size and dimensions of the property
- 5.1.2.2 setbacks of the pool and pool enclosure from existing and proposed buildings and property lines
- 5.1.2.4 existing rights of way, easements and municipal services
- 5.2 Plans submitted shall be legible and be drawn to scale to the satisfaction of the Chief Building Official or designate
Other cities
To report a correction: info@bylawinsider.com. This link opens your mail program.
Unofficial copy for convenience; the official version governs. Official source
Short excerpts of a public bylaw PDF. The official PDF governs.