Canadian municipal bylaws

www.bylawinsider.com

Bylaw Insider

Business directory and news for municipal bylaw enforcement, parking, private security, and towing.

Primary

Barrie By-law 2024-094, s. 8.3.9.1 — For a period of not more than two weeks, sections of a permitted pool enclosure can be replaced with temporary fencing material such as plastic mesh to facilitate maintenance or access to the pool area, provided the temporary fence mate

Pool Enclosure By-law

Last checked

Indexed text

For a period of not more than two weeks, sections of a permitted pool enclosure can be replaced with temporary fencing material such as plastic mesh to facilitate maintenance or access to the pool area, provided the temporary fence mate:

  • By-law 2024-094 OFFICE CONSOLIDATION The Corporation of the City of Barrie Pool Enclosure By-law
  • a) is at least 1.22 metres (4 feet) in height securely supported by posts spaced not more than 1.8m (6 feet) apart;
  • b) securely fastened to the remaining sections of the pool enclosure; and
  • c) has openings that are not greater than 38mm x 38mm (1.5 inches x 1.5 inches) in size.

Short excerpt. The rest of the text is on the official source.

Official source · Table of contents

To report a correction: info@bylawinsider.com. This link opens your mail program.

Unofficial copy for convenience; the official version governs. Official source

Short excerpts of a public bylaw PDF. The official PDF governs.