Brantford By-law 478, s. 478.3.16 — Construction sign - duration - approved Signs erected on any construction project after construction has commenced provided that such signs must be removed within six months of the first occupancy of the building under construction and provided the locations of such signs are approved by the Chief Building Official do not require a permit provided the requirements of Section 478.3.1 are met
Signs and Other Advertising Devices
Last checked
Indexed text
Construction sign - duration - approved Signs erected on any construction project after construction has commenced provided that such signs must be removed within six months of the first occupancy of the building under construction and provided the locations of such signs are approved by the Chief Building Official do not require a permit provided the requirements of Section 478.3.1 are met.
Short excerpt. The rest of the text is on the official source.
Official source · Table of contents
Related sections
- 478.3.14 Election sign Election signs as defined (see Article 5) do not require a permit provided the requirements of Section 478.3.1 are met
- 478.3.15 Development sign - non-illuminated - size - duration A non-illuminated sign not exceeding 6.0 sq m ( 64.5 sq
- 478.3.17 Personal sign - temporary Temporary personal signs as defined do not require a permit provided the requirements of Section 478.3.1 are met
- 478.3.18 Banner sign - temporary - location - restriction Temporary banner signs located within the mixed use, commercial, and employment zone categories established under Zoning By-law 124-2024 do not require a permit provided the requirements of Section 478.3.1 are met. By-law 85-2026, 28 July, 2026
Other cities
To report a correction: info@bylawinsider.com. This link opens your mail program.
Unofficial copy for convenience; the official version governs. Official source
Short excerpts of a public bylaw PDF. The official PDF governs.