Chilliwack : Règlement no 5041, art. 20 — An application for a Construction Noise Exemption is subject to a non-refundable application fee, as set out in the Miscellaneous Rates Bylaw, as amended
Vérifié le
Texte indexé
An application for a Construction Noise Exemption is subject to a non-refundable application fee, as set out in the Miscellaneous Rates Bylaw, as amended.
The Director may impose the terms and conditions of an exemption under Section 19 of this bylaw, as the Director sees fit in order minimize disturbances to the residents of the neighborhood.
Extrait court. Le reste du texte est sur la source officielle.
Source officielle · Table des matières
Articles voisins
- 18(7)
- 19 If it is impossible or impractical to comply with the provisions of Section 17(1) of this bylaw, a person may, on the form and in the manner specified by the Director, submit an application for a Construction Noise Exemption Permit
- 21 If an exemption or relaxation is granted by the Director, the applicant must, at least 48 hours before the start of the exemption period, distribute a notice, in a form and with content satisfactory to the City, to all residents within a 50 metre radius. Such a notice is to include, but will not be limited to, all times and dates, the specific location, and general description of the activity
- 22
Autres villes
Pour signaler une correction : info@bylawinsider.com. Ce lien ouvre votre programme de courriel.
Copie non officielle, pour faciliter la lecture. La version officielle prévaut. Source officielle
Short excerpts of a public bylaw PDF. The official PDF governs.