Canton de Langley : Règlement no 4758, art. 618 — Highway and Traffic Bylaw
Vérifié le
Texte indexé
618. The owner or occupier of a property abutting a highway may submit a request to the Municipality for the construction of a culvert and/or the #5107 09/08/14 installation of boulevard tiling across or within that highway. The Municipality may construct the requested culvert and/or install the requested boulevard tiling, provided the person who submitted the request has first paid to the Municipality an amount equal to 120% of the estimated cost of constructing the culvert and/or installing the boulevard tiling (and installing a bulkhead, if required), as determined by the Engineer. 619 Upon completion of the culvert construction and/or the installation of the boulevard tiling to the satisfaction of the Engineer, the Municipality shall refund or invoice the applicant the difference, if any, between the #5107 09/08/14 amount paid to the Municipality pursuant to Section 618 and the actual cost of constructing the culvert and/or installing the boulevard tiling (and installing a bulkhead, if required), as determined by the Engineer. Bylaw No. 4758 Page 41 PART 7 – PENALTIES Penalty for Conviction
Extrait court. Le reste du texte est sur la source officielle.
Source officielle · Table des matières
Sujets
Articles voisins
- 616(1)
- 616(2)
- 701
- 702 Where it is alleged by a Peace Officer or Bylaw Enforcement Officer that any #5359 person has contravened a provision of this Bylaw, that person, on being 07/05/18 notified of the allegation, may voluntarily consent to pay the penalty for the contravention fixed by and in accordance with Bylaw Notice Enforcement Bylaw 2008 No. 4703, as amended or replaced from time to time
Autres villes
Pour signaler une correction : info@bylawinsider.com. Ce lien ouvre votre programme de courriel.
Copie non officielle, pour faciliter la lecture. La version officielle prévaut. Source officielle
Short excerpts of a public bylaw PDF. The official PDF governs.